project budget造句
例句與造句
- 4 cost control ? controlling changes to the project budget
費(fèi)用控制控制項目預(yù)算變更。 - Discussion on the methods for project budget and settlement verification
工程預(yù)結(jié)算審核方法探討 - Be accomplished in project accounting and project budget control
擅長項目預(yù)算會計或項目預(yù)算審計。 - Manage the project budget based on the cost estimation budget
在費(fèi)用評估預(yù)算的基礎(chǔ)上管理項目預(yù)算。 - What is the average software project budget overrun
如果沒有按照既定預(yù)算完成的話,超過平均預(yù)算多少? - It's difficult to find project budget in a sentence. 用project budget造句挺難的
- Compile documents such as project budget , feasibility study and so on
編寫項目預(yù)算、可行性研究報告等文件。 - Construction project budget
建筑工程概預(yù)算 - Realistic costs for the operation of the account can be built into the project budget
該戶口的運(yùn)作手續(xù)費(fèi)可在財政預(yù)算內(nèi)列明。 - Reasonable cost for the hire of such premises can be included in the project budget
租用這些場地的合理費(fèi)用,可以包括在申請計劃的預(yù)算內(nèi)。 - Discussion on power project budget base estimate the value of total 183 ; net cost seperation determine
基于量183 ;價分離確定電力工程預(yù)算的探討 - Output value of construction projects , that is the value of projects covered by the project budgets
建筑工程產(chǎn)值指列入建筑工程預(yù)算內(nèi)的各種工程價值。 - Typically , resources - people and equipment - take the largest bite out of a project budget . .
一般來說,資源、人力和設(shè)備在整個項目預(yù)算中起決定性作用。 - Where there is a reasonable case , the project budget may build in an appropriate level of contingencies
若理由充分,計劃的財政預(yù)算可預(yù)留適當(dāng)款額作應(yīng)急之用。 - The professor ' s project budget is the initial economic base that supports his independence within the university
教授的課題預(yù)算是其在高校里賴以保持獨(dú)立的首要經(jīng)濟(jì)基礎(chǔ)。 - The project budget sustains both the existence of graduate students and the fiscasolvency of the university
研究生是否存在,大學(xué)是否存在資金償還能力,這些都取決于項目預(yù)算。
更多例句: 下一頁